epoxy floor services

CALL US NOW

New England, USA

Bedford is a professional suburb shaped by Hanscom Air Force Base, MITRE Corporation, MIT Lincoln Laboratory, and the Bedford VA Medical Center. Whatever the scale, industrial operations here serve defense contractors, biotech labs, and government research facilities — and the floors they sit on take real punishment: forklift traffic, dropped tooling, chemical washdowns, freeze-thaw cycles, and slabs that have been carrying loads for years. ART 7 EPOXY LLC installs industrial resin floor systems built for that reality. Not paint. A surface engineered to survive what your facility actually does.

Why a paint kit won’t survive a Bedford industrial floor

The Hanscom-MITRE-Lincoln Lab corridor sets a specific bar for facility floors: precision, cleanliness, ESD requirements in some bays, and the kind of documentation that defense and biotech audits expect. A home-center epoxy kit bonds to dust, peels under the first season of real traffic, and lifts at every floor drain. Industrial epoxy works when three things are right: the substrate is mechanically profiled to expose sound concrete, cracks and joints are structurally repaired, and the resin system is matched to what the floor actually faces — abrasion, chemistry, sanitation, traction zones, or all four.

Industrial systems we install in Bedford

High-build epoxy mortar (1/8″ – 1/4″)

For metal fabrication, warehousing, and any zone with constant forklift turning or dropped tooling. The mortar layer absorbs impact and abrasion instead of telegraphing it into the slab — the standard spec for the heaviest-use bays in Bedford facilities.

Self-leveling epoxy with urethane topcoat

For environments where chemistry matters — sanitation chemicals, hydraulic fluids, mild acids. The urethane topcoat provides UV stability and easier cleaning under the protocols most Bedford facilities run.

Anti-slip and high-traction broadcasts

Coolant zones, washdown areas, freezer entrances, and ramps need real traction. We broadcast aluminum oxide or quartz at controlled rates so the surface stays grippy under wet conditions without sacrificing cleanability.

ESD and conductive systems

For electronics assembly and component manufacturing in the area, we install static-dissipative epoxy that ties into facility grounding, specified per equipment requirements.

Scheduling around production

Most of our Bedford clients can’t shut down for a week. We run night shifts, weekends, and planned-shutdown installs. For multi-zone facilities we sequence by bay so production continues in unaffected areas. Standard cure for a high-build mortar system at 65–75°F: foot traffic in 12–24 hours, forklift traffic in 48–72 hours. Cold or damp conditions extend that, and we’ll tell you upfront.

What you get from us, specifically

Service area around Bedford

We install industrial epoxy throughout Bedford’s 01730 ZIP code area, with same-region service to Lexington, Concord, Burlington, Billerica, and Carlisle, and across the surrounding Merrimack Valley. Multi-facility operators can spec one consistent system across all locations.

Frequently asked questions

Can you handle ESD-spec floors for defense and electronics work?

Yes. We install static-dissipative epoxy systems tied to facility grounding, specified to your equipment standards. Common spec for the kind of work done around Hanscom and the Bedford tech corridor.

How fast can we run forklifts on a new floor?

For standard high-build systems, typically 48–72 hours after final topcoat at normal facility temperatures. We give you a written cure schedule before installation so production planning can lock in around it.

Can you match a previous coating that’s still partly intact?

Sometimes. If the existing system is compatible and sound, we can feather in and recoat. If it’s an unknown system or showing widespread failure, full removal is the better long-term decision and we’ll say so.

Get a written assessment for your Bedford facility

We’ll inspect the slab, recommend the right system for your operation, and quote it clearly. No flat-rate guesses, no pressure.